search

Milk-Run Management

It is ensured that the procuring company, supplier and 3rd party logistics company work on the same data at the same time.

Milk-Run Management //

With the milk-run application; Daily material shipment as needed, just in time…

Milk-Run Management

Milk-Run is a material collection method used to transport loads from various suppliers. It is often used in conjunction with just-in-time production. Based on the current order plans, it defines the supply cycle that allows empty crates to be left at the suppliers on fixed routes at certain times and to transport the full crates to the procuring company.

The vSRM Milk-Run module enables order plans, the creation of milk-run material collection plans, the sharing of planned milk-run services with suppliers and 3PL logistics companies, and the simultaneous management of milk-run operations with all parties.

With the milk-run module; It is ensured that the procuring company, the supplier and the 3rd party logistics company work on the same data at the same time.

The vSRM Milk-run module is flexibly configurable.

1- If Milk-Run Planning is to be done by the 3PL company; integration into the 3PL company’s planning system is made and the loading approvals received one day before the suppliers are sent, and the vehicle loading planning and shipping expedition plans are expected to be made by the 3PL. Milk-Run expeditions created by 3PL company are shared with suppliers with vSRM.

2- If Milk-Run Planning is to be done by the procuring company and Milkrun vehicles are the procuring company’s own vehicles; vehicle planning on the relevant routes is done through the vSRM system and the plan is published to the suppliers.

3- If Milk-Run expedition planning is done in the ERP system, milk-run expedition information can be transferred directly to the vSRM system and published to the suppliers.

Solution covering all sides in the milk-run process

It is ensured that the procuring company, supplier and 3rd party logistics company work on the same data at the same time.

Flexible configuration

Your milk-run operation can be shaped by how you plan and manage it.

Reduction in transportation costs

With the milk-run management, unit transportation costs are reduced.

Regular material transfers

Storage space is saved by daily material transfer as needed, just in time and in small batches.

Ready To order Your Project ?